Lean&Co - Solutions de gestion de l'attente
    Retour au blog
    Guides5 décembre 20255 min

    Pager installation: key steps for success

    Lean&Co Team

    Installing a pager system is simple, but a few key steps ensure successful deployment.

    Step 1: Needs assessment

    Before any purchase, assess your needs: number of simultaneous pagers, required range, environment (indoor/outdoor), integration with your POS.

    Step 2: Location selection

    The call base should be centrally positioned for optimal coverage. Avoid metal obstacles and sources of interference.

    Positioning tips:

    • Base at height (1.5 to 2 meters)
    • Away from microwave ovens
    • Central to the coverage area

    Step 3: Configuration

    Our systems are pre-configured at the factory. Simply charge the pagers, turn on the base, and test the range.

    Step 4: Staff training

    15 minutes of training is usually sufficient. Key points: pager distribution, alert triggering, basic maintenance.

    Step 5: Real-world testing

    Before official launch, test the system during a full service. Check range in all areas, including patios.

    Maintenance

    Our pagers require little maintenance: daily charging, regular cleaning, and monthly range verification.

    Lean&Co Support

    Our team is available for on-site installation if needed. 3-year warranty and responsive support.

    Partager cet article

    Besoin de conseils personnalisés ?

    Nos experts sont à votre disposition pour vous accompagner dans votre projet.